
The Operations Prioritization System (OPS) Answers the Only Question That Matters: What Should We Be Working on Right Now?
Not another dashboard. Not another reporting tool. A continuous intelligence engine that finds what's costing you money, ranks it by economic impact, and routes the right work to the right people — every day.
The Gap Between Your Data and Your Field Crews Is Costing You Millions
Your SCADA system fires 200 alarms a day. Your pumpers drive fixed routes regardless of what's actually happening. Your superintendent juggles priorities from three different spreadsheets. The result: duplicate site visits, wasted windshield time, alarm fatigue, and deferred production that quietly erodes your cash flow — often by 10-15% or more.
The data exists. The decisions don't follow from it. The Operations Prioritization System closes that gap.

The OPS Control Room delivers real-time operational intelligence across your entire operation
The OPS Intelligence Loop
Connects to SCADA, production accounting, CMMS, ERP, and engineering systems. No manual data entry.
Continuously monitors for operational anomalies, production decline, equipment issues, and safety risks.
Scores every issue by estimated economic impact. High-value problems surface first.
Builds constraint-aware daily plans considering crew qualifications, geography, equipment, and urgency.
Delivers prioritized work lists to field crews via mobile. Tracks completion and captures field data.
Real-time dashboards for leadership. No manual reporting. No waiting for briefings.
Every completed task feeds back into the loop. The scoring engine learns from actual outcomes — the system gets smarter every day.
WellOPS
For Upstream
Production optimization across hundreds of wells. State estimation, production allocation, haul prioritization, and chemical optimization — all scored by economic impact.
PipelineOPS
Coming SoonFor Midstream
PHMSA compliance creates $155.1M in first-year costs for operators. OQ-constrained dispatch, integrity risk scoring, and coordinated field execution across hundreds of miles.
Proven Outcomes
Production Uptime
5% less deferred production. 20-35% improvement in deferment capture.
Operating Expense
15-25% LOE/BOE reduction. 15%+ free cash flow uplift.
Safety
TRIR reduced from 1.8 to 0.3. Risk-informed prioritization built into every decision.
Field Efficiency
35% fewer site visits. 40% lower liquid inventories. Optimized routing.
Executive Visibility
Real-time operational picture. No manual reports. No waiting for spreadsheet roll-ups.